Orlando Pool Table Movers: Full-Service Transport & Setup (No Surprises)
A downtown Orlando move looked simple—until we saw the floating stair and glass rail. We staged runners, crated one slate piece, assigned a spotter at each landing, and bagged every hardware set by number. The reinstall took less time than expected, and the first rack rolled true.
What’s Included (Start to Finish)
-
Photo quote & access plan (stairs/doors/elevators/parking).
-
Floor/wall protection, padded turns, labeled hardware bags.
-
Frame square → slate placement → seam clean/seal/feather → precise cloth stretch → multi-axis level → live-ball tests.
-
Optional: slate crating for sharp turns; COI for buildings/HOAs.
When to Pair a Refelt
-
During a move/reinstall, cloth labor overlaps—smart timing.
-
Upgrade to Simonis 860 or new Championship for speed/durability.
-
Fresh facings + pocket angle tune prevent rattles after reinstall.
Leveling That Lasts
Map floor → square frame → feather seams → confirm with readings and shots.
Conclusion
Orlando moves are won in the planning. With route prep, protection, and a disciplined reinstall, you get showroom looks and tour-ready roll—on the first rack.
Related Pages
Refelting & Recovering • Installation • Slate Crating & Stairs • Orlando
